KGOC
TRE bridge inauguration
At
10 A.M on December 31st
t, 2004 the inaugurate
ceremony of GOC TRE bridge
was organized, the bridge
was started constructing
on October 14th , 2004
and it has been invested
and implemented by Phu
Tho Toursit Company with
a cost is about 1.2 Billion
VND. GOC TRE bridge is
designed with length of
72 meters, a width of
3.5 meters, maximum weght
capacity is 5 tons. It
has been built to meet
the demand of local people
and tourists who come
to Vam Sat Ecotourist
site more convenient.